字典九九>英语词典>backlog翻译和用法

backlog

英 [ˈbæklɒɡ]

美 [ˈbæklɔːɡ]

n.  积压的工作
vt.  (使)积压; 储存

复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs 

BEC计算机

Collins.1 / BNC.14585 / COCA.14476

牛津词典

    noun

    • 积压的工作
      a quantity of work that should have been done already, but has not yet been done

      柯林斯词典

      • N-COUNT 积压的事情;未完成的工作
        Abacklogis a number of things which have not yet been done but which need to be done.
        1. There is a backlog of repairs and maintenance in schools.
          对各学校的修缮和维护工作积压了一堆。

      英英释义

      noun

      • an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
        1. something kept back or saved for future use or a special purpose
            Synonym:reservestockpile
          1. the large log at the back of a hearth fire

            verb

            • accumulate and create a backlog

              双语例句

              • The product backlog supersedes traditional requirements artifacts, such as market and product requirements specifications.
                产品待办事项列表代替了传统的需求文档,比如市场和产品的需求规格说明书。
              • First, create a Sprint Backlog iteration plan.
                首先,创建一个SprintBacklog迭代方案。
              • When I returned from maternity leave, there was a backlog of work waiting for me.
                是积压的邮件。我休产假回来上班后,有一大堆工作等着我做,可以说。
              • This is a waste of valuable transmission and processing bandwidth and can cause an unacceptable replication backlog to develop.
                这是一个对宝贵的传输和处理带宽的浪费并且可能导致发展出不可接受的复制日志的积压。
              • This list of tasks becomes the Sprint Backlog.
                任务的列表就成了所谓的代办冲刺。
              • This view can be kept open along with the Sprint Backlog view.
                这个视图可以随着SprintBacklog视图一直打开着。
              • It is normal to have a lot of user stories in your release backlog.
                在发行版的计划安排中,通常包含了大量的用户描述。
              • Such changes and any missing or incorrect functionality were added to the product backlog for the next sprint.
                这些修改和任何缺失的或错误的功能都添加到下一次sprint的产品待办事项中。
              • The team can also use this new knowledge to change estimates of existing stories in the backlog.
                团队还可以使用这些新知识对计划安排中的现有描述进行重新评估。
              • This will cause the operations backlog items to be higher priority on the backlog.
                这会导致运营相关的待办事项条目得到更高的优先级。